Summary
Overview
Work History
Education
Skills
Timeline
Generic

Mihai - Alexandru Butuc

Inginer Instalatii Pentru Constructii
Roman

Summary

Dynamic Engineer with a proven track record at Brenneka Install S.R.L, excelling in quality control and technical reporting. Adept at problem-solving and fostering team collaboration, I consistently delivered projects on time while enhancing efficiency through advanced AutoCAD design techniques. Committed to continuous improvement and maintaining high standards in all endeavors.

Overview

4
4
years of professional experience
1
1
Language

Work History

Engineer

Brenneka Install S.R.L
07.2024 - Current
  • Checked technical designs and drawings for adherence to standards.
  • Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Oversaw quality control and health and safety matters for construction teams.
  • Troubleshot on-site issues promptly using analytical problem-solving skills resulting in minimal delays to the overall schedule.

Site Engineer

Kronstadt Energii Regenerabile
04.2024 - 07.2024
  • Identified and resolved potential structural issues.
  • Enhanced site safety by conducting regular inspections and enforcing strict adherence to safety protocols.
  • Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.

Site Engineer

TERMOPROT S.R.L
05.2023 - 03.2024
  • Delivered projects on time and within budget constraints by effectively managing resources, schedules, and risks.
  • Ensured high-quality standards were maintained throughout the project lifecycle by adhering to industry best practices and codes of conduct.
  • Oversaw quality control processes by conducting regular inspections, addressing non-compliance issues promptly, and implementing corrective actions to uphold project standards consistently.
  • Streamlined communication between project stakeholders with detailed progress reports and timely updates.

Design Engineer

ERA TERMO GAZ S.R.L
02.2021 - 07.2023
  • Streamlined the design process for increased efficiency by utilizing advanced CAD software tools.
  • Managed multiple projects simultaneously while adhering to strict deadlines and maintaining a high level of attention to detail.
  • Addressed design challenges and evaluated alternative design models to meet project requirements.

Design Engineer

LUC INSTAL 2000
03.2023 - 05.2023
  • Checked design compliance with product specifications and standards requirements.
  • Developed detailed 3D models and drawings, ensuring accurate communication of design intent to fabrication teams.
  • Created CAD models and drawings for [Type] designs.
  • Created parts for machining, sheet metal fabrication, and injection molding.

Education

Facultatea De Constructii Si Instalatii

Universitatea Tehnica "Gheorghe Asachi"
Iasi, Romania
02-2020

Skills

Quality control

Technical reporting

Team collaboration

Design development

Material selection

AutoCAD drawing

Problem-solving

Multitasking Abilities

Adaptability and flexibility

Continuous improvement

AutoCAD

Computer skills

Teamwork and collaboration

Timeline

Engineer

Brenneka Install S.R.L
07.2024 - Current

Site Engineer

Kronstadt Energii Regenerabile
04.2024 - 07.2024

Site Engineer

TERMOPROT S.R.L
05.2023 - 03.2024

Design Engineer

LUC INSTAL 2000
03.2023 - 05.2023

Design Engineer

ERA TERMO GAZ S.R.L
02.2021 - 07.2023

Facultatea De Constructii Si Instalatii

Universitatea Tehnica "Gheorghe Asachi"
Mihai - Alexandru ButucInginer Instalatii Pentru Constructii